Saturday, July 29, 2017

New Concrete

Thursday July 27th.

The cement company arrived at 8 AM and started removing the old concrete drive and front porch.


Shortly afterward, Rich showed up and together we looked over the work in the basement. Everything was completed as planned. He said he would be back Monday morning with the Warranty paperwork and for the final payment.

It wasn't long and the entire drive and porch was re-located to the concrete recycling plant a mile away.

The crew had a 15 minute break after the removal of the old concrete until the delivery of new concrete arrived. The porch was the first to be poured.

After the front porch was poured, the delivery continued at a rapid pace toward the garage and the rear of the house. The crew worked rapidly to keep up.

By 4 PM the entire drive and porch was removed and replaced with new concrete. 

Tomorrow a crew will arrive to saw cut the joints and remove the forms. 

Until next time, be safe and God Bless.